Jack Chain

Step 1

  • Choose appropriate plug-in head
  • Adjust the Telescopic Pole to the required length

Step 2

  • Connect required eye screw to Jack Chain with an ‘S’ hook

Step 3

  • Move ring into down position
  • Insert chain inside of the Telescopic Pole

Step 4

  • Place eyescrew into position

Step 5

  • Place Telescopic Pole into position

Step 6

  • Rotate the Telescopic Pole until eye screw is installed correctly

Step 7

  • Lower the Telescopic Pole

Suspended Loads

All loads which are suspended from roof purlins must be fixed either to or within 25mm of the web.

Connection design should follow the rules within AS/NZS4600.

Never attach loads to the purlin lips.